# Poom's Project: Latest YouTube Videos & Shorts

Markdown version of https://vidiq.com/youtube-stats/channel/@poomsproject/videos/ from vidIQ YouTube Stats. Link to that page, not to this file.

As of 2026-10-29, Poom's Project has 801,000 subscribers, 511,712,941 total views, and 599 videos. It ranks #93,712 by subscribers among channels tracked by vidIQ.

The most recent uploads from [Poom's Project](https://vidiq.com/youtube-stats/channel/@poomsproject/). Each video links to its own stats page. The page lists the rest of the channel's videos to signed-in vidIQ users.

## About this sample

- The latest upload vidIQ has for Poom's Project is “Crafting The Custom Axe as a Birthday Gift”, a Short published Oct 27, 2026.
- These are Poom's Project’s 48 most recent public uploads vidIQ has data for, published between May 2, 2026 and Oct 27, 2026 (6 long-form videos and 42 Shorts).
- Median views across these 48 uploads: 19,139. 24 videos are above that median and 24 below.
- Most viewed in the sample: “Restoring a 100-Year-Old Thai Anvil” (6,588,326 views, Aug 6, 2026). Least viewed: “Making a collection of nine axe handles EP.3 \| Rosewood” (1,262 views, Jul 3, 2026).
- Median length: 16:53 for 6 long-form videos; 0:42 for 42 Shorts.
- In this sample, Poom's Project’s consecutive uploads were a median of 3 days apart (shortest gap 0 days, longest 13 days).
- Views are lifetime totals as of Oct 29, 2026, so newer uploads have had less time to collect them. These figures describe only the videos listed here, not the whole channel, and do not show why any video performed as it did. Dates are UTC.

## Recent uploads

| Video | Published (UTC) | Format | Views | Duration | Outlier score |
| --- | --- | --- | --- | --- | --- |
| [Crafting The Custom Axe as a Birthday Gift](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/p5G4P-Sovrk/) | 2026-10-27 | Short | 3,805 | 0:29 | 1.06x |
| [Making a Unique Axe Handle as a Birthday Gift](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/mlqz8C-1JOs/) | 2026-10-22 | Long-form | 1,815 | 18:10 | 3.36x |
| [Restoring an Old Rusty Axe From Trash to Treasure](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/PraaVyEQhmE/) | 2026-10-13 | Short | 30,574 | 2:50 | 1.53x |
| [Behind the scene of making axe handle from Black palm wood](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/4JGPonU4eJk/) | 2026-10-08 | Short | 22,406 | 0:39 | 1.04x |
| [Restoring a Legendary 1923 Winchester Wood Plane](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/Y_Ult06QNyk/) | 2026-10-06 | Short | 30,552 | 2:52 | 1.18x |
| [Dad & Son's Masterpiece Brass Inlay on Black Palm Wood Axe Handle](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/WpdHlD_oz4g/) | 2026-09-29 | Short | 82,839 | 1:43 | 2.75x |
| [Dad & Son's Masterpiece Brass Inlay on Black Palm Wood Axe Handle](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/WpdHlD_oz4g/) | 2026-09-29 | Long-form | 17,203 | 1:43 | 2.75x |
| [Thousands of Splinters Turned Into an Axe Handle:9 Axe Handles EP.5 \| Black Palm Wood](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/w8FoF5g__1Q/) | 2026-09-25 | Long-form | 32,619 | 14:23 | 13.32x |
| [These exotic woods gonna be something special!.](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/asuRWEtPQvw/) | 2026-09-22 | Short | 14,808 | 0:34 | - |
| [Custom axe handle from kamagong wood #woodworking](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/SSJECJ_-U40/) | 2026-09-20 | Short | 13,634 | 0:31 | - |
| [Scrape the kamagong axe handle with a knife](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/N-KN6o4jghc/) | 2026-09-19 | Short | 11,274 | 0:16 | - |
| [Crafting a Mini Axe Keychain 🪓\| No Power Tools](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/2Xown1fddCA/) | 2026-09-08 | Short | 43,722 | 2:48 | 1.87x |
| [Custom Blacksmith Apron from Pakapol Leather X Patradol Studio](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/GZ1xREo_Rd4/) | 2026-09-03 | Short | 16,714 | 0:45 | - |
| [Turning a Rusty Hammer Into a Masterpiece!](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/GC4tpqs7sj0/) | 2026-09-01 | Short | 28,059 | 2:39 | 1.01x |
| [The Ultimate Axe Hanging: Brass Wire Inlay #woodworking #inlay](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/kAY-DPo-lxQ/) | 2026-08-25 | Short | 1,239,004 | 2:34 | 39.98x |
| [Making a collection of nine axe handles EP.4 \| Curly Bungor Wood](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/l_9SAa8hK_M/) | 2026-08-20 | Long-form | 2,319 | 16:18 | 1.46x |
| [The coolest project ever: The Slingshot Axe](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/LAEs64iAhRk/) | 2026-08-13 | Short | 71,005 | 2:07 | 2.93x |
| [Restoring a 100-Year-Old Thai Anvil](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/6RSL0quIV_Y/) | 2026-08-06 | Short | 6,588,326 | 2:45 | >100x |
| [Gift from Santa a vintage double bit axe head](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/0D2NX5IQtB4/) | 2026-08-04 | Short | 19,898 | 0:34 | - |
| [Very rare Vintage Easterbrook Allcard 27" S Shaped Adjustable Spanner Wrench](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/QoqfS5Y6FNA/) | 2026-07-30 | Short | 21,583 | 1:24 | 1.07x |
| [1 Day with Fans- Crafting a Custom Hammer Handle](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/C5mW5joYBXQ/) | 2026-07-17 | Short | 17,101 | 3:00 | - |
| [Watch This Wood Reveal Its Hidden Pattern](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/bBRflq7wunA/) | 2026-07-16 | Short | 22,051 | 0:33 | - |
| [I Challenged Myself to Make an Axe Handle from Scrap Wood #axe #woodworking](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/JVPMIr8T_OY/) | 2026-07-13 | Short | 111,972 | 2:37 | 3.82x |
| [Scrape the rosewood axe handle with a knife](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/1LDeTSgR_Q0/) | 2026-07-12 | Short | 35,450 | 0:07 | 1.15x |
| [Before & After 40" Rosewood Axe Handle](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/pj9Nd1HFfR0/) | 2026-07-09 | Short | 26,537 | 0:23 | 1.19x |
| [Axe wedge detalled with brass wire inlay #woodworking #axe #inlay](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/57jCEcQHqZ8/) | 2026-07-07 | Short | 14,887 | 1:22 | - |
| [Making a collection of nine axe handles EP.3 \| Rosewood](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/SNKtFfsKNvk/) | 2026-07-03 | Long-form | 1,262 | 17:28 | - |
| [Shaping rosewood axe handle](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/40xlUYebDdU/) | 2026-07-02 | Short | 32,096 | 0:12 | 1.99x |
| [WW2 Plumb Victory Barrel Hatchet #tool #vintage](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/YZEAsbrJLT8/) | 2026-06-30 | Short | 14,212 | 1:26 | - |
| [Crafting a unique hybrid hex-octagon hammer handle](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/aPjXBEDkRY4/) | 2026-06-23 | Short | 12,015 | 1:25 | - |
| [Restoring an old rusty claw hammer](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/8DGhPKWDybk/) | 2026-06-20 | Short | 541,190 | 1:52 | 33.98x |
| [20% progress the rosewood hexagonal axe handle🪓🥰](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/4fdDaYZGYGM/) | 2026-06-19 | Short | 15,619 | 0:19 | - |
| [My Dad's Unique Hatchet Handle Design](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/-FEr4RLPI6I/) | 2026-06-18 | Short | 58,015 | 2:24 | 3.71x |
| [How to fix a broken hammer handle](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/jbCCVhiYkIA/) | 2026-06-12 | Short | 34,274 | 0:45 | 2.78x |
| [My new toy Blacksmith leg vise](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/wcAOeEyF2gQ/) | 2026-06-11 | Short | 13,316 | 0:11 | - |
| [The interchangeable adze blades](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/ItY64JGeUCs/) | 2026-06-04 | Short | 18,380 | 0:28 | 1.2x |
| [Vintage Iwan Bros. post hole auger](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/y5nZamcqt-Q/) | 2026-06-02 | Short | 9,924 | 0:34 | - |
| [The Ultimate Adze Blade Swap](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/PXp84z1eXO4/) | 2026-05-30 | Short | 12,459 | 1:04 | - |
| [I made a unique adze with interchangeable blades](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/WDTZM5iuRY8/) | 2026-05-29 | Short | 16,234 | 1:23 | 1.05x |
| [Oil Quenching a Red Hot Adze Blade](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/ONWZT2J54Qg/) | 2026-05-28 | Short | 15,034 | 0:29 | - |
| [Water Quenching a Red Hot Hammer Head!](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/Xio7471ZPOk/) | 2026-05-27 | Short | 21,150 | 0:17 | 1.5x |
| [I Found a RARE Vintage MWA Aluminum Axe in Thailand!](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/AM73lYkOkhY/) | 2026-05-26 | Short | 13,483 | 0:22 | - |
| [Turning a Broken Hammer Into a Unique Adze! (Interchangeable Blades)](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/9HPVIj-gfAA/) | 2026-05-22 | Long-form | 232,305 | 22:26 | 55.3x |
| [Assembling a super cool adze head](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/GCN4Tn5qXeA/) | 2026-05-19 | Short | 13,650 | 1:11 | - |
| [Thai Rosewood and Rainwater](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/UGt3dwEZLKw/) | 2026-05-15 | Short | 8,347 | 0:26 | - |
| [Timeless tools ever, a hand crank drill](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/S-hN6xR6erE/) | 2026-05-12 | Short | 20,157 | 0:13 | 1.37x |
| [Installing a Vintage Bench-Mount Drill Press](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/ml4CtgG-T0Q/) | 2026-05-07 | Short | 16,126 | 0:17 | 1.09x |
| [Planing Hardwood with a Traditional Thai Hand Plane](https://vidiq.com/youtube-stats/channel/@poomsproject/videos/_JuyDOdMMj4/) | 2026-05-02 | Short | 34,732 | 0:14 | 3.38x |

## Live data in ChatGPT, Claude and other AI tools

Ask about Poom's Project’s recent uploads (for example, which got above-median views) with the [vidIQ MCP server](https://vidiq.com/mcp/): it gives AI assistants live stats on any YouTube channel or video. Add vidIQ to [ChatGPT](https://chatgpt.com/plugins/plugin_asdk_app_69dd11f3e50c8191b1ca48d03cf7e2ad) or [Claude](https://claude.ai/directory/vidiq), or connect any MCP client to https://mcp.vidiq.com/mcp. Included in every vidIQ plan, even Free. This page covers public data only. A channel owner can connect their own YouTube channel to vidIQ to add private analytics, such as retention and traffic sources, to the audit.
